sricons123 Beginner
Joined: 04 Oct 2004 Posts: 21 Topics: 11
|
Posted: Fri Oct 08, 2004 4:58 am Post subject: job scheduler |
|
|
Hi
1. In job scheduler how to check which job is running first.. For eg. i've 3 jobs to find out. Instead of finding every job one at a time & noting down the time, can i get by giving all 3 jobs as input to know which one is running first..
2. In job scheduler based on the jobnumber can we make sure that which one is running first.. say for eg. job1 job number is 0010, job2 job number is 0012, job3 job number is 0008. In that case job3 is running first. Is it correct?
Thanks
Sricons |
|
Back to top |
|
|
superk Advanced
Joined: 19 Dec 2002 Posts: 684 Topics: 5
|
Posted: Fri Oct 08, 2004 6:41 am Post subject: |
|
|
Which job scheduler product are you specifically referring to? (CA-7, CA-JobTrac, CA-Scheduler, OPC/TWS, Control-M, etc.) |
|
Back to top |
|
|
sricons123 Beginner
Joined: 04 Oct 2004 Posts: 21 Topics: 11
|
Posted: Fri Oct 08, 2004 6:58 am Post subject: |
|
|
Hi
I'm using CA-JOBTRAC V3.5. |
|